2026-11-17 · 9 min read · Elk Grove
What Is the 11-Month Walkthrough on a New Home, and How Do You Prepare for It?
What is the 11-month walkthrough on a new home?
The 11-month walkthrough is a review of your new home near the end of its first year, timed so that anything you find can be reported while the builder's one-year workmanship coverage is still in effect. You list every item that has appeared since move-in, the builder's warranty team reviews them, and repairs are scheduled under the warranty.
It is not a legal requirement or a single industry standard. It is a habit, and some builders build it into their service programs. Shea Homes, for example, schedules appointments in the 1st, 5th and 11th months of ownership. Whether or not your builder sets one up, it is worth scheduling yourself.
We are Rose and Steven Gonzales of Living In Northern California, a Realty of America team in Rocklin. New construction is roughly 85 to 90 percent of our business, and we remind the buyers we work with when this window is approaching.
Why does the timing matter so much in California?
Several protections on a new California home run for one year, which makes the end of year one the most important deadline in early ownership:
- Fit and finish. Under Civil Code section 900, builders provide at least a one-year written limited warranty on the fit and finish of cabinets, mirrors, flooring, interior and exterior walls, countertops, paint finishes and trim.
- Builder workmanship coverage. Many builders' own warranties cover workmanship for one year. Lennar, for example, covers workmanship, which it describes as construction quality and finish, for one year.
- Irrigation and drainage. Under section 896, the performance standard for irrigation systems and drainage carries a one-year period from close of escrow, and landscaping must be installed to survive for at least one year.
The first year is also when a home shows most of its early items. New lumber dries, the home settles, and every system runs through a full set of seasons, from a Sacramento-area summer to the winter rains. Small cracks, sticking doors and drainage patterns that were invisible at the final walkthrough often appear during that first year.
Scheduling at month 11, rather than month 12, leaves time to submit, schedule and complete repairs before coverage ends. Systems and structural coverage usually run longer, so check your booklet for those dates as well.
How do you prepare for the 11-month walkthrough?
The best preparation starts at move-in, not at month 11. This is the sequence we suggest:
- Keep a running list from day one. A note on your phone or a shared document, organized by room, with a photo and date for each item. Small things are easy to forget by month 11.
- Find your dates. Your closing date starts most coverage periods. Look up each tier in your warranty booklet and set a reminder at month 10.
- Learn your builder's process. Some builders schedule the visit for you. Others expect you to submit a year-end request through a portal or by email. Your warranty booklet or customer care team will tell you which.
- Walk the home room by room about a month before the deadline, adding anything new to your list.
- Consider an independent inspection. Many buyers hire an inspector who regularly inspects new homes to review the house before the walkthrough. Roofs, attics and crawl spaces are hard for an owner to check.
- Submit the list in writing before the coverage period ends, and keep a copy with the submission date.
- Attend the appointment and walk each item with the warranty representative. Ask which items will be repaired, when, and by whom.
- Follow up until every item is closed. Note the repair date for each one.
What should you check before the 11-month walkthrough?
Every home is different, but these are the areas worth a close look before the appointment:
- Walls and ceilings. Drywall cracks, especially at the corners of doors and windows, nail or screw heads pushing through the surface, and paint that has cracked or separated.
- Doors and windows. Doors that stick, swing open or fail to latch; windows and sliders that are hard to operate or let in drafts; damaged screens.
- Floors and tile. Squeaks, lifting or separating flooring, cracked tile and grout, and gaps at baseboards.
- Cabinets and counters. Doors and drawers that are out of alignment, separated seams, and gaps at countertops and backsplashes.
- Plumbing fixtures. Drips, slow drains, loose fixtures and any water staining under sinks.
- Heating and cooling. Rooms that run much warmer or cooler than others after a full summer and winter.
- Exterior. Cracks in stucco or siding, gaps in exterior caulking, and gutters and downspouts that discharge where water should not collect.
- Grading and drainage. Standing water after rain, soil washing away from the foundation, or water flowing toward the home.
- Irrigation and landscaping, if the builder installed them: zones that do not work, broken heads, and builder-installed plants or trees that did not survive.
An item that was never noticed at the final walkthrough is still worth listing. That is exactly what the 11-month review is for.
What does the builder usually not fix at the 11-month walkthrough?
The walkthrough is for warranty items, so it helps to know which items fall outside it before the appointment:
- Maintenance. Civil Code section 907 says homeowners must follow reasonable maintenance obligations and schedules, including those the builder provides. Replacing filters, re-caulking showers, cleaning gutters and adjusting sprinkler timers are typically the owner's job.
- Damage after move-in. Scratches from moving furniture, items damaged by later work and changes you made to the home.
- Appliances. These are often covered by the manufacturer's warranty, and requests go to the manufacturer.
- Cosmetic items accepted at closing. Some builders will not revisit cosmetic marks that were visible and accepted at the final walkthrough.
Builders' standards for what counts as a defect also vary. A hairline crack may be within the builder's tolerance, while a wider crack may not be. Your warranty booklet usually describes these standards, and reading them before the appointment makes the conversation more productive.
What are the most common 11-month walkthrough mistakes?
- Waiting until month 12. A request submitted in the final days may not be scheduled before coverage ends. Start at month 10.
- Relying on memory. The items you noticed in spring are easy to forget by the following winter. Keep the running list.
- Saving urgent items for the walkthrough. Builders treat problems such as a total sewer stoppage, a water leak that cannot be isolated or a complete loss of power as emergencies. Call those in immediately.
- Only reporting by phone. Follow every call with a written request so there is a dated record.
- Skipping the attic and roof. If you cannot inspect them yourself, an independent inspector can.
- Treating the walkthrough as a legal notice. Under Civil Code section 910, a customer service request under a warranty does not satisfy the formal notice that starts California's Right to Repair process. For a serious unresolved issue, talk with an attorney.
What does this look like for a real buyer?
Picture a buyer who closed on a home in an Elk Grove new construction community last December. At move-in, they start a note on their phone. Over the year it collects a sticking pantry door, a few drywall cracks above the stairs, a slow bathroom drain, an upstairs bedroom that stays warm in the afternoons, and a low spot in the side yard where water stands after rain.
In October, a calendar reminder goes off. The buyer reads the warranty booklet, sees that the builder takes year-end requests through its online portal, and books an independent inspector who regularly inspects new homes. The inspector adds two items the buyer could not see: a section of attic insulation that had been disturbed and a downspout extension that had separated.
The buyer submits the combined list in early November, well before the anniversary. The warranty representative walks the home, schedules the repairs, and explains that the side-yard drainage will be regraded. The warm bedroom turns out to need a duct adjustment. By the one-year mark, every item is either completed or scheduled in writing.
How Living In Northern California helps
Rose and Steven Gonzales of Living In Northern California, a Realty of America team in Rocklin, stay with new construction buyers after closing across Roseville, Rocklin, Lincoln, Folsom, El Dorado Hills, Elk Grove and Rancho Cordova. Before you get your keys, we make sure you have the warranty booklet, the builder's service contacts and your key dates. As the end of year one approaches, we remind you to schedule your walkthrough and to consider an independent review of the home beforehand.
Our buying process explains how we handle inspections, the final walkthrough and closing, and our guide to inspections on a brand-new home covers the earlier inspection stages. Start with our new construction buying page, or talk with us about your new home.
Frequently asked questions
- What is an 11-month walkthrough?
- It is a review of a new home near the end of its first year, timed so that any items found can be reported while the builder's one-year workmanship and fit and finish coverage is still in effect. Some builders schedule it for you; others expect you to submit a year-end request.
- Why is it done at 11 months instead of 12?
- Submitting at month 11 leaves time for the builder to review the list and schedule repairs before the one-year coverage period ends. A request in the final days of the year may not be scheduled in time.
- Should I hire a home inspector for the 11-month walkthrough?
- Many buyers do. An inspector who regularly inspects new homes can check the roof, attic and other areas that are hard for an owner to reach, and their report can be added to your warranty request. It is optional.
- What will the builder not fix at the 11-month walkthrough?
- Typically maintenance items, damage that happened after move-in, changes made by the homeowner, appliances covered by manufacturers' warranties, and in some cases cosmetic marks accepted at the final walkthrough. Your warranty booklet lists the builder's standards.
- Does warranty coverage end after the first year?
- Workmanship and fit and finish coverage usually run for one year, but systems and structural coverage often run longer. California's Right to Repair Act also sets longer periods for some items, such as four years for plumbing and electrical systems. Check your warranty booklet for each date.